Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T02BU00961
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/30/2005 | STORMWATER FOLLOW-UP INSP | Approved | ||
06/06/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | I spoke with George Cardiear regarding retention/detention basins within Desert Willow that do not perculate within the alotted 24-hour time line. He explained that he will be heading up the problem with his superiors and will plan to have Borderland re-grade the basins. I will also be notified when this is to occur and will be present during work. Other problems perviously noted to George are also being addressed before final grading inspection is to be requested. | |
05/31/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Drove by site to investigate potential ponding within retention/detention basins. A minute amount is holding within one particular basin but all other basins were clear from any ponding water. |