Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: MODULAR - PLUMBING INSPECITON
| Date |
Description |
Inspector |
Results |
Comments |
| 03/08/2002 |
MODULAR - PLUMBING INSPECITON |
|
Approved |
IVRS - Inspection 0000*1.) CORRECTIONS MADE OK 2.) WATER TEST OK TRANSITION FITTINGS OK 3.) OK TO BACKFILL 1" PEX YARD WATER OK PRESSURE TEST OK 4.) SMALL SECTION OF ABS SEWER WITH LESS THAN 12" COVER, THIS MODULAR IS TEMPORY SEWER WILL BE ABANDONED AT THE COMPLETION OF THE PROJECT. |
| 03/05/2002 |
MODULAR - PLUMBING INSPECITON |
|
Denied |
1.) MUST PROVIDE WATER TEST ON WASTER. 2.) EXPOSE P.O.C. OF BLDG SEWER WHERE IT CONNECTS TO HCS. 3.) MUST USE APPROVED MATERIAL FOR EXPOSED WASTE LINE 4.) ABS SCH 40 MUST HAVEF A MIN. OF 12" COVER. |