Inspection History Details
Permit: T02BU00262
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/28/2006 | GRADING - FINAL | Approved | Contractor supplied letter from engineer in regards to basin #2. Spoke to Dave Roberts he said there should be nothing else holding up the permit. | |
| 12/08/2005 | GRADING - FINAL | Partial Approval | Contractor completed all but one item on punch list. Still waiting for letter from engineer in regards to drainage ways. | |
| 06/28/2005 | GRADING - FINAL | Denied | The Following items need to addressed. 1. Construct weir opening for Basin #1, Per Contract detail 5 on page 5. Verify Elevation. 2. Remove hay bales from weir inlet. Basin #1. 3. Remove sand bags from around scour hole. Basin #1. 4. Remove weeds growing in bottom of Basin #1. 5. Grout Block on perimeter wall around Basin #1. 6. Repair block wall next to Basin #1 inlet. Wall Separation in corner. 7. Remove silt from Basin #1. 8. Grade basin #1 to stop ponding. 9. Fill-in area behind sidewalk next to Basin #1 inlet. 10. Clean trash out catch basin. Basin #1 inlet. 11. Clean silt out of scouring hole. Basin #1. 12. Fill-in area behind sidewalk and in utility easement next to Basin #2 inlet. 13. Clean out catch basin inlet and pipe. Basin #2 14. Clean silt from scouring hole. Basin #2. 15. Clean slit from bottom of Basin #2. 16. Repair erosion on southeast corner of Basin #2. 17. Clean out Basin #2 over flow structure. 18. Install 2-24" CMP's per detail 8 on page 4. Basin #2. (1-36" installed) 19. Clean slit and trash out of over flow structure piping. 20. Replace irrigation box lid. Basin #2. 21. Stabilize area C.A. on southeast corner of property. 22. Remove dirt stockpile from southwest corner of property. 23. Replaced cracked concrete handicap ramp southwest corner of Stringray and Tiger Shark. 24. Replaced cracked concrete handicap ramp east and west side of Blue Shark. 25. Replaced cracked concrete handicap ramp east side of King Salmon. 26. Replace cracked concrete in-front of 391 Hammer Head. 27. Sidewalk shifted into utility easement on lot #5. Not per detail 9 on sheet 5. No longer 50 rightway. 28. Prior to issuance of the first C of O for a development or release of assurances for subdivision, an Arizona Registered Professional Civil Engineer must certify that the drainageways and detention/retention basins have been constructed in accordance with the approved plans. Chapter XIV, Section 14.2(7) |