Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: POOL/SPA FINAL/BARRIER
Permit Number - T02BU00099
Inspection Description - POOL/SPA FINAL/BARRIER
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/28/2002 | POOL/SPA FINAL/BARRIER | Approved | IVRS - Inspection 0000* | |
03/25/2002 | POOL/SPA FINAL/BARRIER | Denied | IVRS - Inspection 0999*/ 1) BARRIER MUST BE BONDED ON THE WEST SIDE OF THE GATE 2) NEC-680-22 PARAGRAPH 5-PATIO ROOF DRIP EDGE IS WITHIN 5' HORIZONTALLY ON 12' VERTICALLY FROM THE POOL WATER AND MUST BE BONDED 3) GAS CLEARANCE WILL BE PROVIDED WHEN FINAL BARRIER IS APPROVED AND THE GAS LINE IS APPROVED (SEE INSPECTION SHEET FROM 1/30/02 |