Inspection Status: Correction Required
Inspection History: INITIAL CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 01/18/2002 |
INITIAL CODE VIOLATION |
|
Correction Required |
INITIAL: MET W/OWNER AND ARCHITECT ON SITE AND WENT OVER THE WORK BEING DONE. A PERMIT IS REQUIRED. HAD A CORD TO WIRE BY TEP AND IT WAS REMOVED. HAS NEW MECHANICAL SYSTEM W/NEW DUCT WORK IN CEILING. ELECTRICAL, PLUMBING FIXTURES OFF BUT WILL BE REINSTALLED. WALL LAYOUT IS UNCHANGED, BUT NEW DRYWALL HAS BEEN ADDED TO ALL WALLS AND LOWER CEILING. CERAMIC TILE WAS BEING INSTALLED AT TIME OF SITE VISIT. F/U 3/04/02. |