Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: INITIAL CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 11/19/2001 |
INITIAL CODE VIOLATION |
|
Correction Required |
INITIAL: INADEQUATE EXIT DOORS FOR EMERGENCY RESCUE OR PANIC. RAW SEWAGE FROM BATHROOM TO BACKYARD. EXPOSED WIRING INTERIOR AND EXTERIOR OF MAIN HOUSE MUST BE DELETED OR COVERED TO PREVENT PHYSICAL DAMAGE. LARGE HOLE IN BACKYARD MORE THAN 5 TONS OF FILL REMOVED. SWIMMING POOL IN BACK YARD INFESTED WITH MESQUITOS. GRAY WATER FROM WASHROOM IS STAGNET AND PUDDLED. PORCH AT REAR OF MAIN HOUSE IS DILAPITATED AND MUST BE REPAIRED. REMODEL OF INTERIOR OF MAIN HOUSE. MANY WALLS ADDED TO SEPERATE AND RENT AS BEDROOMS. LARGE HOLE IN FRONT BEDROOM ROOF. ROOF LEAK THROUGHOUT HOME. WINDOWS AND DOORS HAVE BEEN CLEARED FOR RESCUE OR PANIC. SEWER WAS SNAKED BY OWNER. DRAINING VERY SLOWLY WILL WORK FOR TEMP. FIX. OWNER WILL BEGIN PERMANENT FIX IN THE MORNING. |