Inspection Status: Correction Required
Inspection History: INITIAL CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 09/17/2001 |
INITIAL CODE VIOLATION |
|
Correction Required |
NO PERMIT ON SITE. CHECKED WITH JULIE B AT D.S.C. NO PERMITS ON RECORD. COMPLETE INTERIOR OF THIS BUILDING IS BEING REMODELED. NEW METAL STUD PARTITIONS ETC. ISSUED AND POSTED A STOP WORK ORDER AT MAIN ENTRY DOOR ON THE EAST SIDE. |