Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Correction Required
Inspection History: INITIAL CODE VIOLATION
Case Number - T01VL02510
Inspection Description - INITIAL CODE VIOLATION
Inspection Status - Correction Required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/10/2001 | INITIAL CODE VIOLATION | Correction Required | TALKED TO MANAGEMENT OF UNIT. A/C REPAIR COMPANY WAS OUT. A/C WAS REPAIRED IT WAS LEAKING. DRYWALL IS DRYING OUT. I FOUND DRYWALL NEEDING REPLACING IN HALL. WORK IN PROGRESS. ALL LEAKS HAVE BEEN REPAIRED. ALL WOOD JOIST OK. NO ROTTEN BEAMS. MINOR MOLD MAYBE SPRAY LIGHT BLEACH WATER ON MOLD. F/U IN 15 DAYS ON 09-25-01 |