Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.
Inspection Status: Closed
Inspection History: INITIAL CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 08/22/2001 |
INITIAL CODE VIOLATION |
|
Closed |
|
| 08/14/2001 |
INITIAL CODE VIOLATION |
|
Violation |
IMPROPER OVERCURRENT PROTECTION AT PEDESTAL TO POWE OUTLET RECEPTACLE FOR THE MOBILE HOME LIFE LINE. OK. NEW WIRING TO NEW POST LAMP. NO PERMITS/INSPECTION WIRING NOT APPROVED FOR UNDERGROUND USE. IMPROPER WIRING METHODS EG. USING PLUMBING FITTINGS IMPROPER RACEWAY TERMINATION ETC. |
| 08/14/2001 |
INITIAL CODE VIOLATION |
|
Approved |
RE-SUBMIT OF INITIAL NOTICE OF VIOLATION ORGINAL LOST TO THEFT OF CITY VEHICLE ITEMS OUTLINED IN NOTICE OF VIOLATION DATED REPAIRED/ABATED IMPROPER OVER CURRENT PROTECTION: BREAKER CHANGED TO 50 AMP 2 POLE OK 2.) POST LAMP WIRING WRONG MATERIAL, NO INSPECTION REMOVED OK 3.) IMPROPER WIRING METHODS USING PLUMBING FITTINGS AND IMPROPER CONDUIT TERMINATION ABATED OK. |