Inspection History Details
Inspection Status: Compliance
Inspection History: FOLLOW UP CODE VIOLATION
Case Number - T01VL02363
Inspection Description - FOLLOW UP CODE VIOLATION
Inspection Status - Compliance
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/08/2002 | FOLLOW UP CODE VIOLATION | Compliance | MAIN ELECT. LINES ON (2) ROWS ARE UP AND RUNNING-DONE W/PERMITS. T01EL02538 ISSUED 10/17/01. CLOSE CASE. | |
10/09/2001 | FOLLOW UP CODE VIOLATION | Correction Required | DRAWING PENDING TEP APPROVAL.LOTS ARE EMPTY.F/U 1/07/02. | |
09/06/2001 | FOLLOW UP CODE VIOLATION | Correction Required | JERRY ORTA ELECTRICAL INSPECTOR SPOKE WITH ELECTRICAL CONTRACTOR HIRED BY OWNER RE NEW PEDASTALS. THEY PLAN TO ADD 10 METERS ON THIER OWN RATHER THAN HAVE TEP ADDRESS THEN POSSIBLY RUN OVERHEAD LINES DUE TO SHORTER TIME LINE IN GETTING COMPLETED AND ENERGIZED. JERRY EXPLAINED THAT MUST SUBMIT DRAWINGS AND GET FULL PERMITS INCLUDING A WAIVER RE THE USE OF OVERHEAD LINES. AT THIS CASE RE ELECTRICAL SYSTEM WILL BE CLOSED ONCE COMPUTER SHOWS PERMITS OVERHEAD LINES. AT THIS TIME RE ELECTRICAL SYSTEM WILL BE CLOSED ONCE COMPUTER SHOWS PERMITS SECURED DUE TO OWNER HIRING CONTRACTOR, WORKING WITH TEP, SECURING PERMITS AND WORKING WITH PaCH SECTION. | |
08/24/2001 | FOLLOW UP CODE VIOLATION | Correction Required | UNIT EMPTY. UNIT MUST PASS INSPECTION BEFORE RE-RENTED. F/U IN 45 DAYS ON 10-08-01 |