Inspection Status: Compliance
Inspection History: FOLLOW UP CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 10/24/2001 |
FOLLOW UP CODE VIOLATION |
|
Compliance |
ALL CORRECTIONS HAVE BEEN MADE.VIOLATION ABATED. |
| 09/11/2001 |
FOLLOW UP CODE VIOLATION |
|
Compliance |
NEED (1) OUTLET IN KITCHEN INSTALL. TWO MISSING WINDOWS (BEDROOM) AND (LIVINGROOM). GLASS AT SITE. (NEW) MAINT. AT SITE-OUTLET INSTALLED AT SITE. GLASS BEING INSTALLED AS I WAS LEAVING SITE. NO MIN. HOUSING ISSUES. CLOSE CASE. |
| 08/15/2001 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
TALK TO OWNER BY PHONE AND WILL PERMIT FOR RECONNECT FOR ELECTRICAL AND ONCE PEMRIT ISSUED WILL CHECK HOUSE ON LIVING CONDITIONS. F/U IN 21 DAYS ON 09-05-01 |
| 07/18/2001 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
MET WITH TPD DETECTIVE FISTER AT SANTA CRUZ STATION AND GAVE A STATEMENT ON CASE. REVIEWED ON METER BASE AND DISCONNECT ON HOW THEY TEMPERED WITH METER. SHOWED BY PICTURE HOW TEMPERING WITH METER CREATED A DANGER. GAVE ACCOUNT ON TEP BEING CALLED OUT AND POWER CUT. TALK ABOUT WHY ONCE KNOWING POWER WILL BE CUT WE CHECKED HOUSE OUT. GAVE PICTURE TO DETECTIVE DUE TO COLOR AND THEY HAVE NO COLOR PRINTER IF FAXED WILL KEEP SAME DAY FOR FOLLOW UP. |
| 07/17/2001 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
RECEIVED A CALL FROM DETECTIVE FISTER ON THIS ADDRESS. ADVISED THAT I COULD MEET AT SUBSTATION AND WOULD BRING PICTURES. WILL MEET TOMORROW AT 7:00 AM AND WILL GIVE STATEMENT. |
| 07/16/2001 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
RICK SALDATE RECEIVED A CALL THAT BUIDLING IS OPENED. STOP AT STIE AND OWNER WAS ALREADY SECURING WINDOW THAT WAS OPENED. OWNER SAID IT WAS THIRD TIME BUILDING WAS BROKEN INTO. ADVISED THEY ARE AFTER ITEMS BEING STORED INSIDE. OWNER WAS TO START MOVING ITEMS INTO A STORAGE SO THAT BUILDING CAN BE REPAIRED. WHEN LEFT SITE BUILDING IS SECURED. WILL KEEP SAME DATE FOR FOLLOW UP, UNLESS BUILDING IS OPENED UP. F/U 08-15-01. |