Inspection Status: Correction Required
Inspection History: INITIAL CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 07/19/2001 |
INITIAL CODE VIOLATION |
|
Correction Required |
WATER LINE BREAK UNDER GROUND. 5' SEC. HAS TEMP. HOOKUPS FOR WATER TO TENANTS. WILL NEED PERMITS FOR REPAIRS TO WATER LINE (PLUMBING, PERMIT). STOP WORK WAS ODERED. TILL PERMITS ARE PULLED. F/U IN 10 DAYS ON 07-30-01 |