Inspection History Details
Inspection Status: Correction Required
Inspection History: INITIAL CODE VIOLATION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/22/2001 | INITIAL CODE VIOLATION | Correction Required | WAITING ON CONTRACTOR TO SHOW PERMIT OR ENGINEERED DRAWINGS FOR RETAINING WALLS PER RICK SALDATE. |