Inspection Status: Compliance
Inspection History: FOLLOW UP CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 04/16/2002 |
FOLLOW UP CODE VIOLATION |
|
Compliance |
PERMIT HAS BEEN ISSUED T02BU01056 ON 4/10/02 AND FINALED ON 4/12/02 VIOLATION ABATED CASE CLOSED. |
| 07/18/2001 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
PENDING N.O.V. ON CORRESPONDING ADDRESS. F/U 15 DAYS ON 08-02-01 |
| 07/12/2001 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
MET WITH RICHARD VIDAL ON SITE. THOUGHT WALL WAS O.K. CHECK RECORDS AND MEET WITH R OHAVER ON PRIOR RETAINING WALL INSPECTION.FOUND MOISTURE IN WALL. NO WEEP HOLES FOUND.SOME CRACKS AT MORTAR JOINTS FOUND. SOME BLOCKS ARE CRACKED. WALL APPEARS TO HAVE STARTED TO BOW IN SOME AREAS. FILL BEHIND WALL DOES NOT SEEM TO BE PROPERLY COMPACTED. GIVE CASE BACK TO JESS CRAIG PER RICK SALDATE. |
| 06/22/2001 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
AFTER INSPECTION FOUND WALL STARTING TO FAIL. WAITING ON CONTRACTOR TO SHOW PERMIT OR ENGINEERED DRAWINGS OF RETAINING WALL. ON HOLD PER RICK SALDATE. |