Inspection History Details
Inspection Status: Correction Required
Inspection History: INITIAL CODE VIOLATION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/17/2001 | INITIAL CODE VIOLATION | Correction Required | PROFESSIONAL PLUMBING ON SITE. TO SNAKE MAIN DRAIN TODAY. NO WATER IN UNIT AT THIS TIME. GIVE TO RAY CAMACHO. |