Inspection Status: Compliance
Inspection History: FOLLOW UP CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 06/12/2002 |
FOLLOW UP CODE VIOLATION |
|
Compliance |
PERMIT HAS BEEN ISSUED T02CM01917 ON 4/15/02 AND FINALED ON 5/23/02 VIOLATIONS ABATED. CLOSE CASE. |
| 03/04/2002 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
VISITED SITE AND HAVING TROUBLE WITH GETTING HEAT APPROVED. WILL MEET WITH OWNER TO CHECK ON STATUS. |
| 10/16/2001 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
STILL LACKING HEAT AND STILL TRYING TO GET PLANS APPROVED.F/U 11/15/01. |
| 08/23/2001 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
STILL WORKING ON HEAT AND WILL CHECK WITH PLAN EXAMINER ON APPROVAL OF VENT LESS DOORS ON EXTERIOR ARE DONE, WATER HEATER COMPLETE. UNIT IS VACANT. F/U IN 30 DAYS ON 09-24-01 |
| 04/17/2001 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
WATER HEATER ON REAR PORCH LACK RELIEF LINE FROM VALVE TO GROUND LEVEL. LACKING HEATING UNITS. |