Inspection Status: Compliance
Inspection History: FOLLOW UP CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 09/25/2001 |
FOLLOW UP CODE VIOLATION |
|
Compliance |
PERMIT T01CM02594 HAS BEEN ISSUED(9/20/01). VIOLATION ABATED.CASE CLOSED. |
| 07/30/2001 |
FOLLOW UP CODE VIOLATION |
|
Violation |
TALK TO OWNER BY PHONE AND LDO HAS BEEN APPROVED AND WAITING FOR 14 DAYS ALLOWED FOR PROTEST. WILL CHECK SAME DATE. |
| 07/30/2001 |
FOLLOW UP CODE VIOLATION |
|
Violation |
OWNER STILL WORKING ON DRAWINGS WILL CHECK IN 45 DAYS ON 09-17-01 |
| 06/04/2001 |
FOLLOW UP CODE VIOLATION |
|
Violation |
HAS APPLIED FOR PERMITS T01CM02594 ON 5-30-01 AND GOT APPROVAL FROM FLOOD PLAIN AND STILL CHECKING OTHERS. CALLED TUCSON WATER ABOUT METER BEING MOVED AND HAVE NO RECORDS OR WORK ORDER AND ONLY NOTE COULDN'T FIND METER TO READ. WILL INVESTIGATE. FU 07-20-01 |
| 04/23/2001 |
FOLLOW UP CODE VIOLATION |
|
Violation |
CERTIFIED MAIL RETURNED SIGNED ON 04-16-01. |
| 04/18/2001 |
FOLLOW UP CODE VIOLATION |
|
Violation |
MET WITH OWNER TO DISCUSS REQUIREMENTS ON OBTAINING PERMIT. F/U 06-04-2001 |
| 04/11/2001 |
FOLLOW UP CODE VIOLATION |
|
Violation |
NOV ISSUED. |
| 04/03/2001 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
WORK DONE WITHOUT PERMITS ON CARPORT BEING BUILT. |