Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: INITIAL CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 03/07/2001 |
INITIAL CODE VIOLATION |
|
Correction Required |
EMERGENCY CALL OUT DUE TO FIRE. UTILITIES WERE DISCONNECTED. ARRIVED FOUND SMOKE DAMAGE FROM KITCHEN FIRE ALONG WITH DRYWALL AND HEAT DAMAGE TO KITCHEN. TO INCLUDE ONE ELECTRIC CIRCUIT AND RANGE HOOD DAMAGE. AN ELECTRIC AND GENERAL REPAIR PERMIT REQUIRED. BUILDING DAMAGE-DRYWALL CABINETS FIRE DAMAGED. KITCHEN AND REMAINDER OF UNIT MILD SMOKE DAMAGE AND SOME CHARRING OF ROOF SHEATHING GROUND RANGE HOOD. ELECTRICAL-ONE ELECTRIC CIRCUIT TO RANGE HOOD DAMAGED. MECHANICAL-RANGE HOOD DAMAGED. SUMMARY -AN ELECTRIC AND GENERAL REPAIR PERMIT REQUIRED. NOTICE AND ORDER AND INDEM. SIGNED BY OWNER. FU SCHEDULED FOR 03-13-2001. |