Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: INITIAL CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 03/24/2001 |
INITIAL CODE VIOLATION |
|
Correction Required |
WORK HAS STARTED ON REPAIRS , BY REAL-COMP.WILL F/U IN 15 DAYS-WILL CALL SWM ABOUT POOL FILL WITH OLD WOOD-OWNER WANTS IT FILLED IN |
| 03/01/2001 |
INITIAL CODE VIOLATION |
|
Correction Required |
SITE VISIT I FOUND HOME WAS NOT BOARDED-UP YET CLEAN INSIDE, THERE IS WATER, ELECT. SERVICE TO HOME. HOME WAS OPEN ALSO NOTE THERE IS ELECT. WORK GOING ON AT THIS ADDRESS, ALSO NOTE THERE IS ELECT. WIRING LAYING ON BARE GROUND WITH OUT CONDUIT AS THERE ARE OTHER WIRES ON HOME W/O CONDUIT LOOKS IF THERE A MAJOR WATER LEAK IN REAR.ALSO NOTE SWIMMING POOL IS FILLED 8' OR MORE OF TRASH,OLD FURNITURE, WOOD,METAL,YET POOL IS SECURE.F/U SCHEDULE 3-7-01. |