Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case: T01VL00506

Parcel: 115050720

Inspection Status: Compliance

Inspection History: FOLLOW UP CODE VIOLATION

Case Number - T01VL00506

Inspection Description - FOLLOW UP CODE VIOLATION

Inspection Status - Compliance

Date Description Inspector Results Comments
10/30/2001 FOLLOW UP CODE VIOLATION Compliance VIOLATION ABATED. CLOSE CASE
10/12/2001 FOLLOW UP CODE VIOLATION Correction Required TPR VALVE NOT DONE YET.
10/05/2001 FOLLOW UP CODE VIOLATION Correction Required SPOKE W/OWNER. WILL MEET HIM ON SITE BETWEEN 10-8 - 10-12. HE ADVISES EVERYTHING IS COMPLETE.
07/05/2001 FOLLOW UP CODE VIOLATION Correction Required CITATION ISSUED TO MILIVOJ MARINKOVIC FOR MIN HSG VIOLATIONS.
06/19/2001 FOLLOW UP CODE VIOLATION Violation WORK STILL NOT DONE. F/U ON 07-03-01
05/16/2001 FOLLOW UP CODE VIOLATION Correction Required FURNACE WAS REPAIRED AND TPR VALVE LINE INSTALLED. STILL SOME REPAIRS REQUIRED. FLU 06-18-01
04/24/2001 FOLLOW UP CODE VIOLATION Correction Required DOORS AND WINDOWS NEED TO BE REPAIRED. STILL TOO MANY ROACHES. F/U 05-15-01
03/26/2001 FOLLOW UP CODE VIOLATION Violation CERTIFIED MAIL RETURNED SIGNED 3-23-01.F/U SCHEDULE 4-9-01.