Case: T01VL00355

Parcel: 132171390

Inspection Status: Violation

Inspection History: INITIAL CODE VIOLATION

Date Description Inspector Results Comments
01/29/2001 INITIAL CODE VIOLATION Violation PER INSPECTOR JORTA NOV WAS ISSUED AND SIGNED BY OWNER ON 01/26/2001. DESCRIPTION OF VIOLATION ADDITIONS AND ALTERATIONS TO THE BUILDING ELECTRICAL, PLUMBING, MECHANICAL AND BUILIDNG W/OUR PERMITS YOU MUST HAVE AN A2. REG. ENGINEER SUBMIT TO D.S.D. AN UPDATED ACCURATE PLAN. OBTAIN ALL PERMITS AND CALL FOR NECESSARY INSPECTIONS. ALL EQUIPMENT MUST BE LISTED BY AN OSHA RECOGNIZED TEST LAB PAENL D-1 TO REMIAN OFF U.A.C. 202.6 AUTH TO DISCONNECT, INVESTIGATION FEES DUE UAC 304.5. FOLLOW UP SCHULED FOR 20 DAYS PER INSPECTOR JORTA 02/20/2001