Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 01/04/2002 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection 0000*1.) ALL CORRECTIONS MADE OK 2.) OK FOR GAS 3.) UCC LEFT AT METER. |
| 01/02/2002 |
PLUMBING - GAS PRESSURE TEST |
|
Denied |
IVRS - Inspection 0999*1.) PROVIDE APPROVED PLAN, INCLUDING DEVELOPED LENGTH, AND TOTAL BTU CONSUMPTION OF ALL APPLIANCES ( ISOMETRIC DRAWING) 2.) SECURE W MECHANICAL PERMIT FOR COFFEE ROASTER NO LISTING PLATE ON EQUIPMENT. 3.) REQUIRED PIPE SIZE TO TE RAN ALL THE WAY TO THE EQUIPMENT. 4.) FLEX CONNECTOR TOO LONG, AND UNDER SIZED SEE TABLE 12-10 94UPC 5.) ALL VALVES TO BE AGA OR CSA APPROVED (1210.4) 6.) REPLACE UNION WITH RIGHT LEFT NIPPLE AND COUPLING 1211.10. 7.) REPLACE ROTTED BLOCKING AND SECURE PIPE WITH APPROVED TWO HOLE STAPS. 8.) RETEST SYSTEM AND RECALL FOR INSPECTION. |