Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 01/10/2002 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection 0000*ALL. CORRECTIONS MADE OK 2.) PIPING INSTALLED PER APPROVED PLAN. 3.) OK FOR GAS 4.) UCC LEFT AT METER 5.) GAS FOR ONE ROOF TOP UNIT. |
| 01/08/2002 |
PLUMBING - GAS PRESSURE TEST |
|
Denied |
1.) PLEASE USE CORRECT GUAGE, PRESSURE TEST OF 10# OR LESS REQUIRE A GUAGE WITH TENTH POUND INCREMENTS TEN TO ONE HUNDRED POUNDS REQUIRE ONE POUND INCREMENTS 2.) THIS IS A COMMERCIAL JOB AND REQUIRES AN APPROVED PLAN. IE ISOMETRIC DRAWING SHOWING DEVELOPED LENGTH AND TOTAL BTU CONSUMPTION. |