Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 01/25/2002 |
PLUMBING - FINAL |
|
Approved |
|
| 12/16/2001 |
PLUMBING - FINAL |
|
Denied |
IVRS - Inspection 0999*1.) NEED TO SEE COMPLETED ROUGH PIPING TO THE POINT OF CONNECTION. IN ORDER TO FINALIZE INSPECTION ALL CONNECTIONS NEED TO BE MADE DO NOT TEST THROUGH APPLIANCE! 2.) ALL GAS PIPING MUST BE LISTED AND APPROVED. GAS PIPING WITHOUT A LISTING A53 OR A53A IS NOT APPROVED 3.) PROVIDE AN APPROVED ISOMETRIC DRAWING SHOWING TOTAL DEVELOPED LENGTH AND TOTAL BTU DEMAND. 4.) MAKE CORRECTIONS AND RETEST TO 10# MINIMUM. |