Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 09/25/2001 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection 0000*1.) ALL CORRECTIONS MADE OK 2.) OK FOR GAS 3.) OK TO BACKFILL 4.) UCC LEFT AT METER. |
| 09/24/2001 |
PLUMBING - FINAL |
|
Denied |
IVRS - Inspection 0999*1.) GAS PRESSURE TEST OK GAS PIPING OK 2.) NEW T & P RELIEF DRAIN NOT APPROVED 94 UPC DOES NOT ALLOW FLEX CONNECTOR ON T & P RELIEF RAIN. HARD PIPE WITH A UNION. |
| 09/20/2001 |
PLUMBING - FINAL |
|
Denied |
IVRS - Inspection 0999*1.) NO ADDRESS POSTED 2.) KNOCKED LOUDLY THREE TIMES NO ANSWER AN ADULT MUST BE PRESENT TO ASSIST THE INSPECTOR WHEN SCHEDULING AN INSPECTION 3.) LEFT MESSAGE AT NUMBER ABOVE 4.) RE-WRAP 2 JOINTS OUTSIDE FRONT DOOR. MAKE THEM LOOK LIKE THE OTHER WRAPS. |