Inspection Status: Approved
Inspection History: PLUMBING - PROGRESS
| Date |
Description |
Inspector |
Results |
Comments |
| 08/12/2002 |
PLUMBING - PROGRESS |
|
Approved |
|
| 06/11/2002 |
PLUMBING - PROGRESS |
|
Partial Approval |
BASES HAVE BEEN SET FOR BACKWATER VALVES. |
| 06/07/2002 |
PLUMBING - PROGRESS |
|
Not ready for Inspection |
IVRS - Inspection 0000*1.) NOT READY FOR INSPECTION. |
| 06/06/2002 |
PLUMBING - PROGRESS |
|
Not ready for Inspection |
IVRS - Inspection 0000*NOT READY FOR INSPECTION. |
| 06/05/2002 |
PLUMBING - PROGRESS |
|
Partial Approval |
IVRS - Inspection 0000*1.) M.H. #4 HAS BEEN STACKED OK TO BACKFILL TRENCH. |
| 05/23/2002 |
PLUMBING - PROGRESS |
|
Partial Approval |
1.) 8" SITE SEWER MAIN AIR PRESSURE TEST FROM M.H. #3 WEST TO M.H. #4 IS OK. |
| 05/22/2002 |
PLUMBING - PROGRESS |
|
Partial Approval |
IVRS - Inspection 0000*1.) AIR PRESSURE TEST OF 8" SITE SEWER MAIN FROM M.H. #2 NORTH TO M.H. IS OK. |
| 05/21/2002 |
PLUMBING - PROGRESS |
|
Partial Approval |
IVRS - Inspection 0000* 1.) AIR PRESSURE TEST FROM M.H. #1 TO M.H. #2 8" MAIN IS OK. |
| 05/13/2002 |
PLUMBING - PROGRESS |
|
Partial Approval |
IVRS - Inspection 0000*1.) 8" SITE SEWER FROM HCS STUBB OUT UNIT #4 UPSTREAM TO UNIT #8 IS OK 2.) OK TO BACKFILL TRENCH. |
| 05/08/2002 |
PLUMBING - PROGRESS |
|
Partial Approval |
IVRS - Inspection 0000*8" SITE SEWER MAIN FROM POWER POLE ON EAST SIDE OF P.L. TO THE 1ST HCS FOR UNIT #4 IS OK TO BACKFILL. 2.) NOTE: CONTRACTOR WILL PROVIDE A AIR TEST @ A LATER TIME. 3.) WILL REQUIRE VERIFICATION OF GRADE BY THE SURVEYOR EVERY 50' INTERVALS STAMPED & CERITIFIED @ TIME OF FINAL INSPECTION OF SITE SEWER. |
| 05/03/2002 |
PLUMBING - PROGRESS |
|
Partial Approval |
1.) HAD PRE CONSTRUCTION MEETING ON SITE SEWER ON FIBER OPTIC LINES IN WAY OF NEW SITE SEWER. |