Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 08/22/2001 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection 0000*1.) GAS PRESSURE TEST OK 2.) GAS SHUT OFF VALVES OK 3.) WATER HTR P&T DRAIN, FLU VENT OK. |
| 08/15/2001 |
PLUMBING - GAS PRESSURE TEST |
|
Denied |
IVRS - Inspection 0999*1.) P & T DRAIN FOR WATER HRT IN MAIN HOUSE MUST BE FULL SIZE 3/4" ALL THE WAY TO DAYLIGHT OF YOU MAY USE ALTERNATE INSTALLATION METHODS AS PROVIDED. 2.) MUST SCREW DOWN WITH 3 SHEET METAL SCREW PER JOINT AND VENT COLLAR. 3.) MUST REMOVE THREAD PROTECTORS IN U.G. GAS LINE AND REPLACE WITH APPROVED COUPLINGS 4.) MUST RUN P & T DRAIN TO WATER HTR #2 IN REAL DWELLING TO DAYLIGHT 5.) MUST HAVE 1" CLEARANCE AROUND PBL WALL FLU VENT. 6.) HOOK UP EXSISTING 1/2" GAS LINE TO SYSTEM 7.) RETEST THE SYSTEM 10LBS MIN. |