Inspection Status: Denied
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 06/11/2001 |
PLUMBING - FINAL |
|
Denied |
IVRS - Inspection 0999*1)GAS LINE HAS A UNION IN LINE BEFORE THE ANZEL VALVE.THE APPROVED GAS SHUT OFF VALVE GOES FIRST THAN UNION, ANZEAL VALVE.2)MUST CLEAN OR REMOVE ALL GREASED UP GAS SHUT OFF VALVES TO VERIFY AGA ACCSA STAMPED APPROVAL.3)GAS DROP FOR STEAM TABLE MUST TERMINATE 6" MIN. ABOVE FINISH FLOOR AND ANCHORED.4)RE TEST SYSTEM.5)NOTE:PLUMBING SHOULD NOT TEST WITH ANZEL VALVE DAMAGE. |