Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - SEWER HCS CONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/29/2001 | PLUMBING - SEWER HCS CONNECT | Approved | ||
| 06/27/2001 | PLUMBING - SEWER HCS CONNECT | Not ready for Inspection | IVRS - Inspection 0000*1.) NOT READY FOR INSPECTION | |
| 06/22/2001 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection 0000*1.) SEPTIC TANK #1 EAST HAS BEEN PUMPED AND CRACKED 2.) OK FOR FILL | |
| 06/21/2001 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection 0000*1)SOIL WATER TEST OK.2)OK TO BACKFILL TRENCH.3)MUST SEE FINAL CONNECTIONS OF BUILDING DRAIN TO BUILDING SEWER AND AT HCS CONNECTION.4)MUST HAVE BOTH SEPTIC TANKS PUMPED,CRACKED AND FILLED. 5)PROVIDE SURVEYORS CERIFICATION OF GRAPE AT TIME OF FINAL. |
|
| 06/14/2001 | PLUMBING - SEWER HCS CONNECT | Denied | IVRS - Inspection 0999*1)SEWER MAIN TAP MUST BE ABOVE CENTER LINE OF FLOW.2)MUST SEE SEWER TAP COOKIE TO VERTIFY PROPER TAP WAS MADE. 3)CAN NOT HAVE SAN TEES ON THERE BACKS MUST USE DIRECTIONAL FITTING FOR GRADE CLEAN OUTS EVERY 100'.4)MUST SHADE ENTIRE RUN OF BUILDING SEWER NO BRIDGEING ALLOWED.5)TWO WAY C.O. WITH EXTENSIONS ARE NOT ALLOWED. MUST USE (2) DIRECTIONAL FITTINGS WHERE BUILDING DRAIN CONNECTS TO BUILDING SEWER. 6)BUILDING SEWER HAS ALOT OF BACKPITCH IN CERTAIN SPOTS IN RUN.7)MUST HAVE SEPTIC TANK PUMPED AND CRACKED AT BOTTOM OF TANK.HAVE FILL READY TO VERTIFY.8)WILL REQUIRE A SURVEY TO SHOOT AND VERTIFY, CERTIFY GRADE OF BUILDING SEWER EVERY 50'. |