Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 05/02/2001 |
PLUMBING - FINAL |
|
Not ready for Inspection |
1) PLEASE PROVIDE DRAWING WITH TOTAL LENGTH AND TOTAL BTUS ALL FIXTURES REMOVED AT THIS TIME 2) PROVIDE A PRESSURE TEST OF NOT LESS THAN 10# ON COMPLTE SYSTEM 3) ALL FIXTURES WILL NEED TO BE INSTALLED AT TIME OF FINAL |