Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 03/22/2001 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection 0000$ |
| 03/15/2001 |
PLUMBING - GAS PRESSURE TEST |
|
Denied |
IVRS - Inspection 0999* 1) NEW PIPE THAT EXTENDS TO BELOW GRADE SHALL BE SCOTCH COAT WITH JOINT WRAPPED WITH 10 MIL TAPE 2) REMOVE UNIONS AT BLDG SUPPLY 3) ALL VALVES TO BE AGA OR CSA APPROVED 4) WATER HEATER MUST HAVE T AND P RELEIF VALVE INSTALLED, AND FULL SIZE DRAIN TO OUTSIDE 5) INSTALL SHUT OFF VALVE AT COLD INLET TO WATER HEATER 6) TEST WITH 10# AIR PRESSURE WITH NO DROP IN PRESSURE FOR 15MIN. |