Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 04/05/2002 |
MECHANICAL - FINAL |
|
Approved |
IVRS - Inspection 0000*ALL CORRECTIONS HAVE BEEN MADE. |
| 02/08/2002 |
MECHANICAL - FINAL |
|
Denied |
IVRS - Inspection 0999*COMB ROOF TOP 36,000 BTUH COOL 75 M HEAT. 1.) RE ROUTE GAS LINE AS RUN ACCESS PANEL IS BLOCKED FOR SERVICES. 2.) CONTROL WIRING LAYING EXPOSED ON ROOF SURFACE PROVIDE PROPER RACEWAY AS NECESSARY. 3.) PVC CONDENSATE DRAIN ROOF TOP PIPING OK PVC DOWN SOUTH WALL, ROOF TO GROUND EXPOSED TO SUN NEEDS TO BE PAINTED CORRECT/RECALL ELECT.PANEL 1.) PROVIDE COVER/W GASKET ON LB FITTING 2.) MARK CIRCUIT BKR. FOR A/C UNIT. 3.) PROVIDE PLUG BOTTOM RIGHT HAND CORNER OF PANEL. |