Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 12/11/2001 |
ELECTRIC - FINAL |
|
Approved |
IVRS - Inspection 0000* |
| 12/05/2001 |
ELECTRIC - FINAL |
|
Partial Approval |
IVRS - Inspection 0000*1.) SUPPLY SIDE. NEED GROUNDING BUSHINGS WITH JUMPERS TO CHASSIS BOTH AT BOTH PANELS. 2.) ACCURATE ADDRESS LABELS ON ALL METERS AND PEDESTALS. 3.) TIGHTEN ALL CONNECTIONS IN W. PANEL. 4.) INSTALL GRD. FROM GRD BAR TO CHASSIS OF SUB-PANEL.5.) CHANGE BREAKERS IN SUB-PANEL TO CORRESPOND WITH MANUFACTURES OF THE PANEL. SEIMENS PANCEL, USING CUTER HAMMER BREAKER.6.) AT PEDESTALS: SEPARATE GRD. & NEUTRAL CONDUCTORS. MOVE GRD CONDUCTOR TO THE CHASSIS GROUND STRIP. |