Permit: T01EL02733

Parcel: 11619175A


Addresses:

475 N GRANADA AV


Inspection Status: Approved

Inspection History: ELECTRIC - INTERMEDIATE

Permit Number - T01EL02733

Inspection Description - ELECTRIC - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
07/02/2002 ELECTRIC - INTERMEDIATE Approved IVRS - Inspection 0000*
06/13/2002 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection 0000*1.) FINISH SECURING SWITCH IN BOILER ROOM. ALL OTHER ITEM HAVE BEEN ABATED
05/06/2002 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection 0000* 1.) FINISH DISCONNECT IN BOILER ROOM 2.) PLEASE USE APPROVED CONNECTOR FOR CORD. 3.) DISCONNECT NEED TO BE LABELED. 4.)WE HAVE EXPOSED CONDUCTORS PLEASE TERMANATE OR REMOVE 5.) PLEASE FINISH ITEMS 1,3,4,& 5,
02/04/2002 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection 0000*NEW EXIT LIGHT HAS BEEN INSTALLED AT EXPOSED CONDUCTORS OK LIGHT.
02/01/2002 ELECTRIC - INTERMEDIATE Denied IVRS - Inspection 0999*1.) PLEASE LABEL PANEL ON OUTSIDE OF COVER 2.) BREAKERS IN PANEL "C" NEED TO BE LABELED. 3.) BOTTOM COVER OF SPLIT PANELS NEED TO BE LOCK FOR CONTROLED ACCESS BY QUALIFIED PERSONS ANY DUE TO EXPOSSED LIVE PARTS. 4.) BUILDING "B" REMOVE REGISTATION TO ROOT FOR WORKING CLEAENCE PER CODE 110-26 & FILL UNUSED OPENINGS. 5.) EXPOSED WIRING FOR LIGHTING NEED TO BE CORRECTED 6.) FIXTURES TO BE LISTED FOR WATHER PROOF USAGE. 7.) FINISH KITCHEN INSTALLATION OF EQUIPMENT 8.) KITCHEN ICE MACHINE DISCONNECTS GROUDNING TO BE CORRECTED 1 CONDUCTOR PER SPADE AND USE THRADED GROUND SCREW. 9.) EXIT LIGHT ON 4TH FLOOR BY ELEVATOR HAS EX PSED CONNDUCTORS AND OPEN JUNCTION BOX THIS POSES AN IMMEDATE HAZARD AND NEED TO BE CORRECTED NOW. YOU HAVE 30 CALENDAR DAY TO COMPLETE WORK.
01/24/2002 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection 0000*1.) BOND PANEL ENCLOSURE 2.) PLEASE TIGHTEN LOCK NUTS 3.) FILLER BLANKS ARE NEEDED FOR UNUSED OF IN PANEL. WORK IS PROGRESSING ALONG PLEASE CALL FOR PARTIAL INSPECTION.
01/10/2002 ELECTRIC - INTERMEDIATE Not ready for Inspection IVRS - Inspection 0000*MEET WITH TOWER ELECTRIC AND VIEWED VARIOUS LOCATION OF THE VIOLATIONS. CONTRACTOR WILL NEED TO INSPECT PROPERTY AND MAKE CORRECTIONS AS NECESSARY TO CORRECT SAFTEY AND CODE VIOLATIONS THE WORK NEEDS TO BE IN PROGRESS WITHIN 10 CALENDAR DAY OR FURTHER ACTION WILL BE NECESSARY.COMPLETION OF PROJECT IS TO BE WITHIN 30 CALENDAR DAY. A LETTER FROM A STRUCTUAL ENGINEER IS STILL REQUIRED FOR THE AREA AS INSTRUCTED BY THE BUILDING INSPECTOR. NOTE IF LOAD CALCULATIONS AREA HIGHER THAN EXISTING SERVICE LOAD A SET OF PLANS WITH LOAD CALCULATION WILL BE REQUIRE.
11/27/2001 ELECTRIC - INTERMEDIATE Not ready for Inspection IVRS - Inspection 0000*MEET WITH MANAGER AND MAINTENCE ELECTRICAN TO DISCUSS AREA ON PROJECT TO BE REPAIRED.