Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 08/27/2001 |
ELECTRIC - FINAL |
|
Approved |
IVRS - Inspection 0000* |
| 08/21/2001 |
ELECTRIC - FINAL |
|
Denied |
IVRS - Inspection 0215*THE NEC ARE 230-40 DOES NOT PERMIT TWO SETS OF SERVICE ENTRANCE CONDUCTORS BE INSTALLED IN A SINGLE CONDUIT. THIS CAN BE DONE ONLY IF THE SERVICES ARE TAPPED TO/FROM A SINGLE SET OF CONDUCTORS. SIZED TO THE LOAD. THE ONLY WAY TWO SEPARATE SERVICE METER MAIN LOAD CENTER PANELS CAN BE CONNECTED TO THE SAME SERVICE LATERAL IS TO RAISE A SEPARATE MUST FROM EACH PANEL AND ALLOW THE POWER CO. TEP TO GROUP CONNECT AT THE WEATHER HEAD. |