Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 08/27/2001 |
ELECTRIC - FINAL |
|
Approved |
IVRS - Inspection 0000* |
| 08/21/2001 |
ELECTRIC - FINAL |
|
Denied |
IVRS - Inspection 0215*THE NEC ARE 230-40 DOES NOT PERMIT TWO SETS OF SERVICE ENTRANCE CONDUCTORS BE INSTALLED IN A SINGLE CONDUIT. THIS CAN BE DONE ONLY IF THE SERVICES ARE TAPPED TO/FROM A SINGLE SET OF CONDUCTORS. SIZED TO THE LOAD. THE ONLY WAY TWO SEPARATE SERVICE METER MAIN LOAD CENTER PANELS CAN BE CONNECTED TO THE SAME SERVICE LATERAL IS TO RAISE A SEPARATE MUST FROM EACH PANEL AND ALLOW THE POWER CO. TEP TO GROUP CONNECT AT THE WEATHER HEAD. |