Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/03/2001 | ELECTRIC - FINAL | Approved | IVRS - Inspection 0000* | |
| 04/23/2001 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection 0000*1. SUPPORT CONDUIT AS PER CODE, 1/2" ABOVE PANEL. 2. USE CORRECT SPLICING METHODS FOR SPLIT BOLTS PANEL & JUNCTION BOX. | |
| 04/18/2001 | ELECTRIC - FINAL | Denied | IVRS - Inspection 0999* 1) LOOSE FITTING-LB 2) CLEAN SUFACE UNDER LUG 250-12 3) CAN NOT USE SHEET METAL SCREW 250-8 4) USE CORRECT SPLICING METHODS FOR SPIT BOLTS 5) NEED ALL STRANDS UNDER LUGS 6) TIGHTEN ALL FITTINGS ON TOP OF PANEL 7) SUPPORT ALL CONDUITS AS PER CODE 8) NEED 2 SUPPORTS BELOW ROOF LINE FOR RISER 9) PROTECT SE CABLE 10) CLEAN OUT BOTTOM OF PANEL |