Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 04/30/2002 |
FRAMING |
|
Approved |
IVRS - Inspection 0000* |
| 04/25/2002 |
FRAMING |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) INSTALL 10D'S NAILS JOIST-HANGER HANGERS 2) COMPLETE PLUMBING WATER, WASTE VENT AND TEST ALL |
| 04/24/2002 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/ 1) PLUMBING NOT READY 2) MISSING ANCHOR BOLTS THRU-OUT 3) AT MASTER BEDROOM PROVIDE DOUBLE STUD EACH SIDE OF AIR DUCT TOP TO BOTTOM AND HEADER 4) PROTECT ALL PLUMBING WITHIN 1 1/2 FROM EDGE OF STUD AND ELECTRICAL WITHIN 1 1/4 FROM EDGE OF STUD 5) NO WATER TEST DWV'S 6) STOPPED INSPECTION IN MASTER CLOSET 7) RECALL WHEN ALL TRADES ARE COMPLETE |
| 04/23/2002 |
FRAMING |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 04/22/2002 |
FRAMING |
|
Not ready for Inspection |
IVRS - Inspection 0000* |