Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 04/08/2002 |
BUILDING - FINAL |
|
Approved |
IVRS - Inspection 0000* |
| 02/12/2002 |
BUILDING - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) GAS LINE FROM HOUSE TO FIREPLACE MUST BE BURRIED AT LEAST 12" DEEP AND MUST BE INSIDE A VENTED SLEEVE PER PLUMBING CODE. 2) ALL GAS LINES FROM HOUSE TO FIREPLACE MUST BE TESTED AN AIR PRESSURE TEST OF 10 PSI FOR 15 MIN (MUST BE WITNESSED BY INSPECTOR) 3) AS NOTED ON PREVIOUS, GAS FLEX LINE MUST NOT PENETRATE MASONRY. 4) I RECOMMEND THAT YOU HAVE A LICENSED PLUMBING CONTRACTOR RE-RUN THE GAS LINES PER CODE 5) PROVIDE MANUFACTURERS SPECS ON GAS LOG SO CHIMNEY HEIGHT CAN BE VERIFIED |
| 01/24/2002 |
BUILDING - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) GAS LINE UNDER SLAB MUST BE IN VENTED SLEEVE 2) FLEX GAS LINE NOT PERMITTED TO PENETRATE MASONRY 3) PRESSURE TEST IS REQUIRED ON GAS LINES 4) FIREPLACE CHIMNEY MUST TERMINATE MINIMUM 3' ABOVE ROOF 5) FLEX LINES NOT PERMIITED TO BE CONNECTED IN SERIES |