Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
The login landing page when selecting 'View' is still occurring and is still pending further investigation.
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 12/15/2003 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection 0000*/ MEDIUM PRESSURE REGULATOR IS OK. VENT THRU ROOF IS OK. |
| 12/03/2003 |
PLUMBING - GAS PRESSURE TEST |
|
Denied |
1) MEDIUM PRESSURE SYSTEM REQUIRES 60 POUNDS OF AIR PRESSURE TEST SEE SECTION 1204.3.2, 94 UPC 2) MUST REMOVE REGULATOR AND UNION IN LINE FOR WATER HEATER AND RETEST SYSTEM 3) LOCATE GAS PRESSURE TEST GUAGE AT WATER HEATER TO VERIFY TEST 4) MUST PLUG OR CAP ANY VALVES THAT ARE NOT CONNECTED TO EQUIPMENT |