Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T01CM05970
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/03/2004 | ENGINEERING - FINAL | Approved | ||
| 07/02/2004 | ENGINEERING - FINAL | Denied | THIS SITE HAS BEEN DENIED AT THIS TIME FOR THE FOLLOWING REASONS: 1) THE SIGNAL LIGHT INTERSECTION ON RIVER HAS NOT BEEN COMPLETED AT THIS TIME. 2) ROOF DRAINAGE IS BEING DEPOSITED ONTO THE ADJACENT SIDEWALKS THROUGHOUT THIS SITE. ALL RAIN WITHIN THE 10-YEAR STORM NEEDS TO PASS UNDERNEATH ALL SIDEWALKS AND PEDESTRIAN PATHWAYS. 3) COMPLETE ALL BASINS AS SHOWN ON THE APPROVED PLANS. 4) CLEAN AND CLEAR ALL DRAINAGE STRUCTURES ON THIS SITE, A VISUAL INSPECTION OF ALL BASINS WILL BE PERFORMED PRIOR TO THE ACCEPTANCE OF THE STRUCTURES. |