Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2002 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection 0000*1.) SOIL WATER TEST IS OK 2.) BLDG. DRAIN IS STUBBED OUT @ TWO WAY C.O. 3.) OK TO BACKFILL. |
|
| 11/18/2002 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection 0000* 1.) HAD PRE CONSTRUCTION MEETING ON ROUGH PLBG. WITH PLBG. CONTRACTOR. |