Inspection History Details
Inspection Status: Approved
Inspection History: LANDSCAPE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/01/2003 | LANDSCAPE - FINAL | Approved | PER THAD | |
| 12/17/2002 | LANDSCAPE - FINAL | Partial Approval | Pending SCZ Buffer revegetation. | |
| 11/25/2002 | LANDSCAPE - FINAL | Partial Approval | Building 19 Per 3.7.2.7 Plant Cover/Dust Control, All disturbed, grubbed, graded, or bladed areas not otherwise improved shall be landscaped, reseeded, or treated with an inorganic or organic ground cover to help reduce dust pollution. There are areas surrounding building 19 that do not have any ground treatment. Per the plan hydroseeding is called out for the 3:1 slopes and a general note number nine calls out all disturbed areas shall be revegetated with seed mix A or B. Please treat the bare areas. Within the Scenic Route buffer area and the MS&R right-of-way, all areas between the MS&R right-of- way line and the existing street right-of-way that are disturbed by development shall be revegetated with native vegetation. |
|
| 08/07/2002 | LANDSCAPE - FINAL | Partial Approval | ||
| 07/12/2002 | LANDSCAPE - FINAL | Partial Approval | OK FOR TEMP C OF O. JON 907-7555 |