Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
Permit Number - T01CM05802
Inspection Description - PLUMBING - FINAL
Inspection Status - Not ready for Inspection
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/03/2002 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*1.)CONTRACTOR HAS BACK ORDERED ONE LAVATORY AND ONE BAR SINK. EVERYTHING ELSE IS COMPLETE. SHELL BLDG. FINAL HAS 3 MINOR CORRECTIONS. TI. CONTRACT READY FOR FINAL MUST FINAL SHELL BEFORE C OF O. ISSUANCE. A TEMP C OF O IS 2.) OK WITH ME. |