Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date |
Description |
Inspector |
Results |
Comments |
| 08/30/2002 |
EXT METAL CLIPS/EXT SHEATHING |
|
Approved |
IVRS - Inspection 0000* |
| 08/19/2002 |
EXT METAL CLIPS/EXT SHEATHING |
|
Not ready for Inspection |
1) SPENT FIRST 5 MINUTES LOOKING FOR PLANS, DID NOT FIND 2) PLEASE CLEAN UP JOB SITE 3) ROMEX WIRING NOT COMPLETE WIRES HANGING OUT OF WALLS 4) INSTALL FIREPLACE 5) FINISH ALL PLUMBING 6) ZERO PRESSURE ON GAS LINE 7) FILL SOIL LINE TO ROOF VENT 8) INSTALL ALL BANG PLATES AND PLATE STRAPS WERE HOLES ARE LARGER THAN ALLOWED 9) HD8A REQUIRED PER PLAN 5A INSTALLED 10) SECURE REAR SLIDING DOOR FRAMING 11) MINIMUM STAIR HEAD ROOM 6'-8" FROM TANGENT LINE STAIR NOSING 12) MISSING SHEAR AND HD AT LAUNDRY 13) FIRE BLOCKING STAIR 14) INSTALL SAFETY GLASS AT STAIR 15) CRIPPLE AT WEST WALL PLATE SPLICES TOP 16) BLOCK MECHANICAL 17) TEMP BRACING FOR WALLS 18) CHECK BOTTOM PLATE FOR AB'S AND NAILS 19) SHEAR TRANSFER FRONT AND REAR TO GO TO ROOF DECK |
| 06/07/2002 |
EXT METAL CLIPS/EXT SHEATHING |
|
Denied |
IVRS - Inspection 0950*/ 1) EXTERIOR CLIP NOT COMPLETE |