Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 12/21/2001 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection 0000*NOT READY NEED PRESS TEST. |
| 12/07/2001 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) CONNECT FLUE 2) NEED HI/LOW DUCTS 10" X 10" EACH 3) INSTALL FUSE STATE AT FURNACE OUTLET 4) WATER HEATER FLEX REQUIRES CONNECTOR AT WATER HEATER FOR FLEX 5) NEED GAS LINE PRESS TEST 6) SEE OTHER ITEMS FROM LAST INSPECTION |
| 11/19/2001 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) NEED RETURN AIR, TO FURNACE 2) NEED COMB/RELIEF DUCTS 3) FUSE STAT, OUTLET FOR FURNACE 4) NEED A AIR PRESS TEST ON GAS LINE 5) REMOVE COMBUSTIBLE TAPE FROM FLUE 6) HAVE USE FURNACE INSPECTED BY A QUALIFIED PERSON BEFORE START UP 7) WATER HEATER, REQUIRES A #10 COPPER FEEDER 30 AMP CIRCUIT 8) NEED FLEX CONNECTOR FOR COLD SIDE OF WATER MAKE UP. DON'T USE WASHER HOSE 9) NEED TEMP PRESSURE RELIEF LINE TO EXTERIOR WALL 3/4" COPPER 9) ROMEX FOR WATER HEATER TO BE IN CONDUIT 10) GAS PIPE NOT HOLDING PRESSURE 11) COMBUSTION REFLIEF DUCT SIZES 100 SQUARE INCHES EACH |