Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 01/21/2004 |
PLUMBING - INTERMEDIATE |
|
Approved |
IVRS - Inspection 0000*/ 1) GAS PRESSURE TEST IS OK 2) OVER HEAD WATER DISTRIBUTION IS OK 3) WASTE AND VENT SYSTEM IS OK |
| 01/16/2004 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ INSTALL HOT WATER PER PLAN AND INSTALL CLEAN OUTS PER PLAN. |
| 01/15/2004 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
IVRS - Inspection 0000*/ MENS RESTROOM #7 AND WOMENS RESTROOM #8 H20 PIPING IN WALL ONLY 2" NATURAL GAS FROM METER 1½ AND 1¼ TO 2. WATER TEST OK. HEATERS ON SOUTH WALL AND 1½ TO 1ST HEATER ON NORTH WALL OF HANGER 10 PSI TEST- PARTIAL APPROVAL. |
| 01/13/2004 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 12/18/2003 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) OVERHEAD WTR DISTRIBUTION IS OK. 2) OK FOR DRYWALL. 3) THIS INSP. IS FOR BLDG 'B' ONLY. |
| 12/10/2003 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) SOIL WATER TEST IS OK FOR U.G. PLBG SYSTEM EXCEPT RESTROOMS ROOM #21 AND 25 DETAIL #3 P1-1 |
| 11/14/2003 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) 4" VENT THRU ROOF WATER TEST OK FOR VENT FOR FLOOR DRAINS IN HANGER BAY. 2) WASTE VENT THRU ROOF FOR EDF ON NORTH HANGER BAY WALL WATER TEST OK. |
| 11/12/2003 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) PLEASE PROVIDE CITY APPROVED DRAWINGS FOR ALL CHANGES TO PLAN AND HAVE CITY RE-ISSUE ROUGH SOIL INSPECTION |