Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 02/07/2002 |
PLUMBING - ROUGH, SOIL |
|
Approved |
IVRS - Inspection 0000*/ 1) NOTE: BEACAUSE THE NORTH LOT LINE IS GREATER THAN 3' TO THE HOUSE, IT WILL BE NECESSARY TO VERIFY SET BACK AT THE TIME OF PRE-SLAB INSPECTION. PLEASE PROVIDE STRING LINE AT LOT LINE AT PER-SLAB INSPECTION. ALSO A FULL ONE HOUR FIREWALL WILL BE REQUIRED ON THAT SIDE OF HOUSE. GARAGE SOUTH LINE WILL ALSO REQUIRE STRING LINE AT PRE-SLAB AND FIRE WALL ON VERTICAL CONSTRUCTION |