Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 06/07/2002 |
PLUMBING - INTERMEDIATE |
|
Approved |
IVRS - Inspection 0000*1.) CORRECTIONS MADE OK ABS WATER TEST OK PEX PRESSURE TEST OK 2.) CLOSET FLANGES OK 3.) TUBS OK 4.) OK TO COVER ALL AREAS. |
| 06/04/2002 |
PLUMBING - INTERMEDIATE |
|
Denied |
IVRS - Inspection 0999*1.) SEE 313.2 ITEM NUMBER TWO INTERPETATION MANUAL BUNDLING OF HOT AND COLD WATER PIPING. 2.) CONTRACTOR TO PAY RE-INSPECTION FEE. |
| 06/03/2002 |
PLUMBING - INTERMEDIATE |
|
Denied |
IVRS - Inspection 0999*1.0 PROVIDE LISTING FOR BUNDLING OF PEX PIPE. 2.) DO NOT COVER UNIT THIS HAS BEEN RESOLVED. |
| 05/31/2002 |
PLUMBING - INTERMEDIATE |
|
Denied |
IVRS - Inspection 0999*BOTH GAS LOCKED NO ACCESS. |
| 05/22/2002 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
IVRS - Inspection 0000*1.) SEE NOTE # 01/07/02. WHY WASN'T I CALLED FOR PRE POUR INSPECTION? WHATEVER I WANTED TO SEE, IS NOW UNDER CONCRETE; ANY SUGGESTIONS? 2.) PROVIDE LISTING AND INSTALLATION INSTURCTIONS FOR AIR ADMITTANCE VALVE ONLY ACCEPTED WHEN STRUCTURAL CONDITIONS LIMIT ANY OTHER INSTALLATION. 3.) PROVIDE LISTING FOR "BUNDILNG " OF PEX PIPE. |