Inspection Status: Approved
Inspection History: BUILDING ABOVE CEILING
| Date |
Description |
Inspector |
Results |
Comments |
| 05/15/2002 |
BUILDING ABOVE CEILING |
|
Approved |
IVRS - Inspection 0000* |
| 05/13/2002 |
BUILDING ABOVE CEILING |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 05/10/2002 |
BUILDING ABOVE CEILING |
|
Denied |
IVRS - Inspection 0999* BECAUSE CISCA INSTALL STANDARD FOR CEILING GRID DOES NOT ALLOW POP RIVETS FOR ALIGNMENT. I AM ASSUMING YOU ARE USING UBC STANDARD. THEREFORE 1.) UBC 25.209.2 CARRYING CHANNELS MUST BE LEVEL WITHING 1/8" IN 12' ( CHECK YOU TERMINAL ENDS.) 2.) UBC 25.209.3 LOCAL KINKS OR BENDS SHALL NOT BE MADE IN HANGER WIRES AS A MEANS OF LEVELING 3.) UBC 25.212.1 12 GAGE HANGER WIRES MAY NOT BE SPACED MORE THAN 4' ON CENTER. 4.) UBC 25.212.2 TERMINAL ENDS OF EACH CROSS RUNNER AND MAIN RUNNER SHALL BE SUPPORTED A MAXIMUM OF 8" FROM EACH WALL DISCONTINUITY. 5.) UBC 25.212.4 ENDS OF MAIN RUNNERS SHALL BE TIED TOGETHER TO PREVENT SPREAD. |