Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/24/2008 | FRAMING | Approved | IVRS - Inspection :* | |
| 10/13/2008 | FRAMING | Denied | 1) NO DWV TEST 2) NOT ENOUGH PRESSURE FOR GAS TEST 3) NEED TO FIRE SEAL ALL FRAMING AT BLOCK WALL TOP PLATE 4) NEED BANG PLATE AT BOTTOM PLATE FOR JACK AND JILL BATH 5) NEED TO COMPLETE EXHAUST FOR EXHAUST FANS-JACK & JILL BATH AND MASTER BATH 6) NEED TO MOUNT RECEPT BOX AT BEDROOM 7) FURNACE B-VENT THRU ROOF NEEDS TO BE DOUBLED WALL 8) NEED TO INSTALL TPR LINE FOR WATER HEATER |
|
| 04/16/2008 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NEED CONNECTION AT BEAM POCKET FOR GLU LAM ENGINEERING 2) NEED TO BLOCK RAFTER CONNECTION AT EXT. BEARING WALL 3) NO PRESSURE ON TEST GAUGE FOR GAS 4) NO DWV TEST 5) NEED TO RED LINE ALL CHANGES IN PLANS 6) BROKEN STUD AT BATHROOM WALL 7) NEED TO FIRE SEAL ALL FURRED OUT WALLS |
|
| 06/03/2003 | FRAMING | Partial Approval | IVRS - Inspection 0000* COMPLETER ALL INTERMEDIATE ELECT, PLUMBING, MECHANICAL, PRIOR TO FINAL FRAMING APPROVAL. |